Updated: March 18, 2010
The Receipt Point List provides you with a summary of Receipt Custody Transfer Points (CTPs) and their related Receipt Physical Measurement Points on the TransGas natural gas transportation system. Detailed information as to land locations, pressures, firm demand, capacities, and whether there is outstanding customer contribution at the points is found in the report. The Receipt Point List will be kept current and is subject to the terms of use.
Note the following: The Design Capacity at Meter GJ/d is based on the conditions at the time a meter is setup or changed out. As conditions change over time this value may vary somewhat, and, thus, the Design Capacity at Meter GJ/d should be used as a guideline only. The spare capacity identified is at the receipt meter (measurement point), and may not represent the capacity of a specific lateral or transmission section. Spare Capacity Identified = Design Capacity – Total Firm at all associated CTPs.
When one Measurement Point has multiple Custody Transfer Points (CTP), the Design Capacity and the Spare Capacity for this Measurement Point will be displayed with the CTP of the lowest numerical code, and for the other CTPs will be displayed as ****
At Measurement Points where Design Capacity is not indicated, the Design Capacity and Spare Capacity for all Custody Transfer Points (CTPs) associated with such Measurement Points will be displayed as ----
Generated: 2010 Mar 18 00:28:15