Planning Your Work

If you plan activity within 30 metres of the pipeline right of way, you must consult with TransGas before moving ahead. Some approvals may take longer than others, so plan ahead. This includes calling us in advance for projects and activities such as:

• Operating non-agricultural heavy vehicles or equipment on the right-of-way where no roadway exists, this may require berming or bridging over the pipeline right-of-way
• Installing fence posts
• Use of explosives in the proximity of the pipeline
• Deep sub-soil, drainage ditches or burying of rock and bush piles
• Any excavating within 30 metres of the pipeline right-of-way
• Digging goose pits This list of activities is intended only as a guideline.

If you are in doubt about a planned activity, please call 1-(306)-777-9666.

Planning a project near piplelines?

 

 

 